Let's talk

UNION CO × SAFETY TECHNOLOGY CLUJ-NAPOCA

Technology
moves
forward.

From the first device installed
to the resources recovered from it.

Conceptual continuous-loop sculpture combining electronic surfaces, copper and photovoltaic glass
A CIRCUIT OF POSSIBILITIES IT / SECURITY / ENERGY / ENVIRONMENT
Two companies. Four specialisms.

Connecting technology, protection,
energy and resource recovery.

01—04

01 / SPECIALISMS

Where does
your project begin?

A new IT fleet. A protected space. Energy from the sun. New value from electronics. Choose a specialism to see what we do.

UNION CO · IT DIVISION

From unboxing
to everyday use.

We supply technology and keep it running: from workstations and printers to software and IT system administration.

Talk to our IT team
01

Equipment supply

Desktop computers, laptops, tablets, phones, monitors, peripherals, printing equipment and consumables.

02

Configuration & administration

Operating system and application installation, support and maintenance for desktop computers, laptops and servers.

03

Hardware & software support

Hardware repairs, malware removal and operating system optimisation.

04

Printing & office equipment

Repairs for printers, copiers, multifunction devices, monitors and UPS units. Collection of used cartridges for recycling.

For businesses, institutions and individuals

We supply through direct sales, tenders and public procurement. The same team can discuss equipment, maintenance and, through our Environment Division, collection of end-of-life equipment.

PC componentsLaptops & tabletsMonitors & peripheralsCartridges & tonersSoftware licences
Explore all IT services

02 / PROJECTS IN PRACTICE

Our scale shows
in our projects.

From digitally equipped classrooms to protected public infrastructure. Projects from both companies, with roles, results and sources you can verify.

01

Digitalisation & IT infrastructure

2024 · EDUCATION · PNRRSupply contract

City of Zalău

Digital equipment for 25 educational institutions

43865″ 4K interactive displays
438laptops specified in the contract

The project includes videoconferencing cameras, document cameras, printing, audio systems and connectivity. UNION CO's role: supply, installation and commissioning for classrooms and preschool rooms.

Contract no. 86843/05.11.2024, lot 3. The quantities are those specified in the contract.

Contract published by the client (PDF)
2022 · IT INFRASTRUCTUREContract completed

CUP Dunărea Brăila

IT support for regional project implementation

IT equipment for the project implementation unit: laptops with operating system and productivity licences, scanning equipment and two-dimensional design software.

The client confirms completion of contract CF4 on 29 July 2022.

Contract status published by the client

UNION CO's experience extends to research and the circular economy, with results published in AUTOCAT and CEF_CYCLE.

02

Security, integration & continuity

2022 · SOCIAL INFRASTRUCTUREContract completed

City of Zalău · PT17 Day Centre

Equipment for a new space for children

Supply of electronic and IT equipment for the project converting the former PT17 district heating station into a children's day centre.

Contract no. 66919/29.08.2022, lot 1, awarded to Union Protection, is listed as completed in the municipality's official register.

Completion confirmation (PDF)
2024–2026 · MAINTENANCEPublished contracts

Public institutions in Cluj-Napoca

Keeping security systems running

Cluj County Council: maintenance of video surveillance and intrusion alarm systems at the institution's headquarters, contract no. 50/2026.

Creșa pentru Educație Timpurie: maintenance of fire detection and alarm systems, smoke vents and indicator lights, procurement DA35144565/2024.

Union Protection and Safety Technology are the same company, under its former and current names.

COMPLEMENTARY TECHNICAL SERVICES

3D scanning

Building and spatial data to support the design and operation of facilities.

Mobile 3D scanning

Interior and exterior capture, point clouds and 3D imagery. Support for engineers, architects, evacuation plans and emergency response preparation.

Explore 3D scanning
Union CO metal recovery facility, photograph published by the company
PHOTOGRAPH FROM UNION CO'S FACILITIESHere, resources
move forward.

03 / WHAT CONNECTS US

IT was the start.
Chemistry came next.

Union CO began in 2004 with IT products and services, then expanded into electronics collection and recycling. The team brings together sales professionals, IT specialists and chemists, while applied research develops resource recovery processes.

2004

UNION CO

IT supply and support, WEEE treatment and metal recovery. Research projects in partnership with INCDTIM Cluj-Napoca.

2009

SAFETY TECHNOLOGY

Electronic security, networks and 3D scanning. Experience in photovoltaic power supplies for equipment.

Explore our research projects

04 / APPLIED RESEARCH · UNION CO

Building the future.
In the laboratory.

Electronic waste contains resources. European and national projects develop the technologies we use to recover them: metals, copper, plastics and resins.

EUROPEAN PROJECT2018–2019

ERDF · ROP 2014–2020

RECOVERGOLD

Investment in a technological platform for recovering recyclable materials and treating wastewater.

Material recoveryTechnological platform & wastewater treatment
Objectives and technology +

Expanding advanced production capacity

The project was designed to diversify UNION CO's activities through equipment, services and intangible assets. Its announced objectives include a recovery platform, wastewater neutralisation and the creation of three jobs.

Beneficiary
UNION CO SRL
SMIS code
115462
Contract
3411 / 29.10.2018
Announced period
29.10.2018 – 30.09.2019

These are the objectives announced at the start of the project.

NATIONAL PROJECT2020–2022

UEFISCDI · Technology transfer to industry

AUTOCAT

Technology transfer for the recovery of platinum-group metals from spent automotive catalytic converters, in partnership with INCDTIM.

>95%Reported recovery rate
>99%Reported purity

Results of the final AUTOCAT stage, published by the beneficiary.

Technology and results +

The research focused on optimising the chemical technology, transferring it from the laboratory to the existing production line and purifying the recovered metals. The figures above describe the project's results.

Coordinator / partner
UNION CO / INCDTIM Cluj-Napoca
Contract
33PTE / 27.05.2020
Duration
24 months

Research results on platinum recovery are also presented in a scientific article in Studia UBB Ambientum, co-authored by researchers from INCDTIM and UNION CO.

NATIONAL PROJECT2023–2024

Ministry of Economy · Circular economy

CEF_CYCLE

Electronic waste: a circular and efficient approach. Extending recovery to non-metallic components, plastics and resins.

Separation & pelletisingRecovered materials, laboratory and composites
Objectives and project completion +

The project covered a separation and pelletising line, development of the chemical analysis laboratory and research into composites made from recovered materials. UNION CO announced completion of the activities on 30 September 2024.

1processing line
1analysis laboratory
2plastic composites · TRL 4
1cement-based composite · TRL 4

Results published on the project website. TRL 4 denotes technology validation in the laboratory.

Scope
Transition to the circular economy
Contract
64/RUC/ME / 22.05.2023
Period
22.05.2023 – 30.09.2024
NATIONAL PROJECT2025–2026

UEFISCDI · PNCDI IV · Partnership for Innovation

EFILUX

Copper recovery through electrolysis to improve the process for recovering noble metals from electronic waste.

Copper recoveryElectrolysis & pilot-scale transfer
Objectives and partnership +

The project aims to separate copper and increase the concentration of noble metals in the material processed for gold, silver and platinum recovery. The planned stages are laboratory optimisation, pilot-scale transfer and optimisation of the pilot process.

Coordinator / partner
UNION CO / INCDTIM Cluj-Napoca
Project code
PN-IV-P7-7.1-PTE-2024-0095
Contract
7PTE / 08.01.2025
Published duration
24 months · 2025–2026

This description presents the project's published objectives.

EUROPEAN PROJECT · 2010–2011

Digitalisation through ERP implementation

SOP IEC / ERDF project to increase productivity, reduce operating costs and improve management decisions. Completion was announced in 2011.

ERP systemDigitalising internal processesProductivity & integrated managementCompany announcement (PDF, p. 7)

05 / STANDARDS

UNION CO certifications

From IT support to recycling, each certificate has a specific scope. Open the entries to see the activities covered, document number and validity period.

ENVIRONMENT DIVISION · APAHIDA

WEEELABEX

Treatment of IT and telecommunications equipment.

Operator
UNION CO SRL · 24-0224
Operating site
Str. Libertății nr. 301A, Apahida
Scope
WEEE category 6 · SHA, type 1
Scheme
EURo B2101
Period
14.08.2025 – 13.08.2027
Official WEEELABEX register

Management systems

Holder: UNION CO SRL · Issuer: Eupont Cert International Certification

ISO 9001:2015Quality management

The EN ISO 9001:2015 certificate covers, among other activities, IT sales and support, computer system manufacturing, waste treatment and recovery, and applied research.

Certificate
MR 3417 26 EU
Period
22.07.2026 – 21.07.2029
ISO 14001:2015Environmental management

The EN ISO 14001:2015 certificate includes the collection and treatment of hazardous and non-hazardous waste, recycling and recovery of sorted materials.

Certificate
KR 3418 26 EU
Period
22.07.2026 – 21.07.2029
ISO 27001:2022Information security

Information security management for activities including IT equipment distribution and maintenance, and computer system design.

Certificate
IR 3409 26 EU
Period · Romanian document
09.05.2026 – 08.05.2029
Period · English document
08.05.2026 – 07.05.2029
ISO 13485:2016Quality management for medical devices

The certification concerns the company's quality management system. Its stated scope includes IT distribution and support, as well as computer system design and manufacturing.

Certificate
IR 3411 26 EU
Period
08.05.2026 – 07.05.2029
SA 8000:2026Social responsibility and decent work · Eupont Cert attestation

Eupont Cert attests to the assessment of UNION CO's social responsibility management system for its commercial and technical activities.

Eupont Cert document
IR 3410 26 EU
Stated period
08.05.2026 – 07.05.2029

The issuer specifies that the documents are valid together with the annual audit reports.

06 / HOW WE WORK

Questions first.
Then the solution.

Requirements, location and delivery deadlines shape the project. This is where our conversation starts, whichever division you need.

01DISCUSSION

We understand your needs.

We start with your activities, current challenges and the goals you want to achieve.

02SOLUTION

We define the project.

We bring technical requirements, budget and work stages together in a clear proposal.

03IMPLEMENTATION

We stay involved.

We agree on delivery, commissioning and the right support for your chosen solution.

07 / YOUR PROJECT

Let's get
things
moving.

IT equipment, security, photovoltaics or WEEE?
Tell us what you need, where and by when.

0364 730 584UNION CO · Str. Nikola Tesla nr. 4, Cluj-NapocaMonday–Friday, 08:00–17:00 · 0364 730 583 / 584
SAFETY TECHNOLOGYoffice@sstc.ro

How can we help?

Describe the equipment or solution you need.

You can send your enquiry from your email application. This form does not send or store your data.

FREQUENTLY ASKED QUESTIONS

Good to know.
From the start.

Can I discuss a project involving several divisions?+

Yes. Choose “A project involving several divisions” in the form and briefly describe your requirements. We can then identify the relevant specialisms and next steps.

How do I request collection of old equipment?+

Select Environment & recycling. Include the equipment types, approximate quantities and location. The Union CO team will agree the collection terms and required documents with you.

What information is useful for a photovoltaic system?+

The location, building type, energy consumption and available area are a good starting point. Configuration and cost are determined after analysing the requirements and site.

YOUR ENQUIRY

Your message is ready.

Open your email application, review the message and send it to our team.

RECIPIENT
Open email application

This website has not sent your enquiry.

PRIVACY

Your form data stays with you.

The form prepares a message locally in your browser. It does not send the completed fields to a server or save them in the website's local storage.

If you choose to send the message, it is sent through your email application to the selected company's address. For questions about data sent by email, contact office@unionco.ro or office@sstc.ro.

This page does not add analytics tools, advertising cookies or tracking. The hosting service may use technical mechanisms for access and security.